BUILT PROJECT / FOUNDER’S EXPERIENCE
Bud Dome.
A custom hemispherical LED installation. A walk-in retail experience. One coordinated physical environment.
- End brand
- Budweiser
- Markets
- China, India & Brazil
- Structural development
- SCORE GROUP
WHAT THE PROJECT DEMONSTRATES
Connected disciplines.
Coordinated execution.
LED systems, physical fixtures, specialist suppliers and installation requirements had to come together in one retail environment.
- LED solution, integration, mapping and playback verification.
- Supplier and production coordination, with factory testing before shipment.
- Shanghai installation management and international technical guidance.
- A display and primary framework designed for dismantling and redeployment.
Founder & execution team project experience. Structural development: SCORE GROUP.
THE EXPERIENCE
Digital on the outside.
Discovery within.
Bud Dome brings an outward-facing hemispherical LED surface together with an internal merchandising environment. The exterior presents moving brand content; the entrance leads into a space for products, football memorabilia and a digital photo interaction.
The installation connects digital storytelling with the practical demands of a retail display: product presentation, customer access and a physical presence in the store.
ENGINEERING & PRODUCTION
Separate disciplines.
One working installation.
The founder-led execution team coordinated the LED solution with specialist suppliers, production and the surrounding physical installation. SCORE GROUP carried out structural development.
Coordinating the interfaces
The curved display, entrance opening, interior fixtures and service access needed to fit together. Technical coordination covered power distribution, ventilation, modular assembly and the relationship between the LED system and its supporting structure.
From display surface to playback
The execution team completed LED control-system integration, display mapping, playback verification and factory testing before shipment. Electrical requirements for each destination market were confirmed during order execution.
INSTALLATION
Hands-on locally.
Connected internationally.
Shanghai, China
The project lead personally supervised and coordinated on-site installation and commissioning at Shanghai RT-Mart Huangpu.
India & Brazil
The team provided remote technical guidance to local installation crews, supporting assembly and commissioning. Installations across China, India and Brazil were completed and accepted on site.
REDEPLOYMENT
Built for another
activation.
The LED display system and primary supporting framework were designed to be dismantled and redeployed. Selected decorative components could be replaced for subsequent activations.
The installation previously used in Shanghai has since been put into use again at another location in China.
PROJECT CREDITS
The work.
The responsibilities.
- GIWOX founder & execution team
- LED solution and system integration, supplier and production coordination, factory testing, Shanghai installation management, and international remote technical support.
- Structural development
- SCORE GROUP
- Project attribution
- This case presents the project experience of GIWOX’s founder and execution team.